色精品一区二区三区-色久阁-色久影院-色久综合大榴莲-国产成人精品亚洲一区-国产成人精品一区

ChineseEnglish Hotline:0571-86062609
Industry information current location:Home  > News > Industry information
Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: 日本在线不卡一区 | 亚洲图色视频 | 四虎国产精品成人永久免费影视 | 久久亚洲aⅴ精品网站婷婷 久久亚洲成人 | 天天澡天天摸天天添视频 | 国产小视频在线观看免费 | 狠狠干狠狠搞 | www.夜夜爽 | 给个网站可以在线观看你懂的 | 欧美大色网| 日本www高清| 亚洲系列_1页_mmyy11 | 能看毛片的网址 | 成人综合在线观看 | 久久精品国产乱子伦多人 | 免费观看一级成人毛片 | 色综合色综合色综合色综合 | 国内精品免费视频自在线 | 一区二区三区高清视频在线观看 | 天天干天天拍 | 日本久久综合视频 | 在线观看精品国产福利片100 | 久久五月网 | 我被黑人巨大开嫩苞在线观看 | 性久久久久久久 | 影院午夜 | 在线 | 一区二区三区 | 日本高清视频在线www色 | 亚洲免费一 | re99热| a一级| 流不尽奶水的大乳h | 777色狠狠一区二区三区香蕉 | bt天堂在线www最新版资源网 | 欧美成人三级网站 | www.亚洲成人| 成人伊人亚洲人综合网站222 | 成人a大片高清在线观看 | 性夜影院午夜看片 | 日本口工全彩无遮拦漫画大 | 国产成年网站v片在线观看 国产成人91青青草原精品 |